Installation Points Of Regulating Valve

Installation Points Of Regulating Valve

Installation Points Of Regulating Valve

1) The installation position, height, and direction of inlet and outlet must meet the design requirements, and the connection should be firm and tight.

2) The handles of all kinds of manual valves installed on the thermal insulation pipeline must not be downward.

3) The valve must be visually inspected before installation. The nameplate of the valve should comply with the current national standard “General Valve Marking” GB 12220. For valves with a working pressure greater than 1.0 MPa and a cut-off effect on the main pipe, the strength and tightness performance test should be carried out before installation, and the valve can be used only after it is qualified. During the strength test, the test pressure is 1.5 times the nominal pressure, and the duration is not less than 5 min. The valve housing and packing should be qualified without leakage. During the tightness test, the test pressure is 1.1 times the nominal pressure; the test pressure should meet the requirements of the GB 50243 standard during the test duration, and no leakage on the valve flap sealing surface is qualified.

Contact Us
Let's Start A New Business Today

Latest Blog Posts

en_USEnglish